Engineering - Civil Enginnering
You Are Here :: Home > Civil Engineering > Tunnel Engineering-General Questions
7. | In "full face" method of constructing tunnels, the first operation relates to |
|||||||
|
8. | Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than |
|||||||
|
9. | The correct sequence of drilling equipment for increasing size of holes in tunnels is |
|||||||
|
10. | The most suitable soil for compressed air tunneling is |
|||||||
|
11. | What is the correct sequence of the following events in rock tunnelling? |
|||||||
|
12. | Which of the following is not a component of the shield ? |
|||||||
|
« prev
1
2
3
4
next »