Engineering - Civil Enginnering
You Are Here :: Home > Civil Engineering > Surveying-General Questions
25. | For accurate work, the steel band should always be used in preference to chain because the steel band |
|||||||
|
26. | For which of the following permanent adjustments of theodolite, the spire test is used ? |
|||||||
|
27. | Height of instrument method of levelling is |
|||||||
|
28. | If a tripod settles in the interval that elapses between taking a back sight reading and the following foresight reading, then the elevation of turning point will |
|||||||
|
29. | If in a closed traverse, the sum of the north latitudes is more than the sum of the south latitudes and also the sum of west departures is more than the sum of the east departures, the bearing of the closing line is in the |
|||||||
|
30. | If the length of a chain is found to be short on testing, it can be adjusted by |
|||||||
|
« prev
1
2
3
4
5
6
7
8
9
next »