31. |
For laying the railway track, materials required are The quantities required for one kilometre of Broad Gauge track will be
|
A. |
Rails |
B.
|
FishPlates |
C.
|
Fish Bolts
|
D.
|
Bearing Plates
|
|
Answer: Option B
Explanation:
|
32. |
For the purpose of track maintenance, the number of turn out equivalent to one track km are
|
|
Answer: Option D
Explanation:
|
33. |
Gauge is the distance between
|
A. |
center to center of rails |
B.
|
running faces of rails |
C.
|
outer faces of rails
|
D.
|
none of the above
|
|
Answer: Option B
Explanation:
|
34. |
Heel divergence is
|
A. |
always less than flangeway clearance |
B.
|
equal to flangeway clearance |
C.
|
always greater than flangeway clearance
|
D.
|
sometimes greater than flangeway clearance
|
|
Answer: Option C
Explanation:
|
35. |
In a shunting signal if the red band is inclined at 45° it indicates
|
A. |
stop |
B.
|
proceed |
C.
|
proceed cautiously
|
D.
|
none of the above
|
|
Answer: Option B
Explanation:
|
36. |
Lead of crossing is the distance from the
|
A. |
heel of the switch to the toe of the switch |
B.
|
heel of the switch to the theoretical nose of the crossing |
C.
|
toe of the switch to the theoretical nose of crossing
|
D.
|
toe of the switch to the actual nose of crossing
|
|
Answer: Option B
Explanation:
|