Engineering - Mechanical Engineering

You Are Here :: Home > Mechanical Engineering > Production Technology -General Questions

 
31.

Gnatt charts are used for                        


A. forecasting sales B. production schedule
C. scheduling and routing D. linear programming




32.

Gnatt charts provide information about                        


A. break even point analysis B. production schedule
C. material handling layout D. determining selling price




33.

Graphical method, simplex method, and transportation method are concerned with                        


A. break-even analysis B. value analysis
C. linear programming D. queuing theory




34.

In Halsey 50-50 plan, output standards are established                        


A. by time study B. from previous production records
C. from one's judgement D. all of the above




35.

In inventory control, the economic order quantity is the                        


A. optimum lot size B. highest level of inventory
C. lot corresponding to break-even point D. capability of a plant to produce




36.

In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic pay/wages, is based on :                        


A. a standard rating system B. a merit rating system
C. a job evaluation system D. his individual performance




« prev

1

2

3

4

5

6

7

8

9

next »

 
 



© 2013 freshersindia.in ® | Copyrights | Terms & Conditions
   Designed by Freshers India
Catch Us on