1.

A low unit cost can be obtained by following                        


A. product layout B. functional layout
C. automatic material handling equip¬ment D. specialisation of operation




2.

ABC analysis deals with                        


A. analysis of process chart B. flow of material
C. ordering schedule of job D. controlling inventory costs money




3.

Acceptance sampling is widely used in                        


A. batch production B. job production
C. mass production D. all of the above




4.

According to MAPI formula, the old machine should be replaced by new one when ? ;(CAM = Challenger's Adverse minimum DAM = Defender's Adverse minimum)                        


A. CAM < DAM B. CAM > DAM
C. CAM = DAM D. there is no such criterion




5.

Basic motion time study gives times for basic motions in ten thousandths of                        


A. second B. minute
C. hour D. day




6.

Basic tool in work study is                        


A. graph paper B. process chart
C. planning chart D. stop watch