Q.

In the network shown in Fig. , the critical path is                         


A. 1-2-3-4-5-6 B. 1-2-4-5-6
C. 1-2-3-5-6 D. 1-2-4-3-5-6

Answer: Option A
Explaination:

 


No Explanation